未命名 2
~ DR
1 “An analysis of heuristics in a dynamic job shop with weighted tardiness” MDD/ODD/MOD/
COVERT
2 “A comparative analysis of the COVERT job sequencing rule using various shop performance
measures” COVERT
3 “A comparative study of dispatching rules in dynamic flowshops” RR
4 “Using dispatching rules for job shop scheduling with due date based objectives” CR CR+SPT
S/RPT+SPT
5 “A state of the art survey of dispatching rules for manufacturing job shop operations” 13
~