Software Quality – Lecture # 1
COMP 10066
Week 4 Lecture
Copyright By PowCoder代写 加微信 powcoder
Recorded by
Lecture # 4 – Software Quality – Test Plans
The goal of planning provides a way to identify:
Requirements
Scheduling
Involves the team (developers/marketing/management)
All parties need to be involved to ensure a quality product.
Key to success is communicating the test plan
Test Plan Planning / Brainstorming
Purpose of the testing
What is in the testing scope?
What will be tested, what will be omitted.
Degree or level?
What type of testing?
Unit testing
Integration Testing – Interface with existing systems.
Do test systems/databases need to be set-up for the testing.
Systems Testing
End User Testing / Acceptance Testing
Test Plan Planning / Brainstorming
Who will Test it?
Programmers?
Testing Team?
Customers?
What are the quality goals of the product?
Must have features completed vs. Nice to have features
Max # of bugs found in the last iteration
Could also be elimination of all severe bugs
Test Plan Document
Actual look and feel of the document is company specific
In Assignment 2 of this course, we will define the sections required for the test plan submission
Test Plans – Starting and Stopping Testing
Entry and Exit Criteria for the testing plan
Under what conditions can testing start?
Will we do it throughout the cycle?
Do we wait for development to complete?
documentation complete?
When are we done?
Quality achievement level has been obtained
Bug detect frequency (i.e. # bugs/week)
Scheduling requirement – Deadline cannot be missed
Test Plans – Resource Planning
List the resources that should be defined and include in a Testing project.
People **
Equipment **
Office Space
Software / Tools specific for the testing **
Reporting / Tracking software
Outsourcing companies
Miscellaneous Supplies
Domain Reference material
Domain training material
** – important for small testing projects
Test Plans – Integration into Project
Since Testing must be integrated into the SDLC process, list the first way the scheduling could be placed into the project.
Hard Date scheduling
Fix start and stop dates.
Advantages
Eases scheduling / resource allocation
Only real solution for outsourcing situations
Disadvantages
Difficult to control entry and exit conditions from a quality perspective.
Delays can compromise the testing process
Test Plans – Integration into Project
Since Testing must be integrated into the SDLC process, list the second way the scheduling could be placed into the project.
Relative Dates
Advantages
Start date not set until “Entry Condition” for the test cycle is met.
Original estimates for testing time should be closer to reality.
Disadvantages
Shifted time may not optimize resources.
Testing team may be allocated to other projects in future and may still end up in a time crunch.
Test Plans – Classifying the “Bugs”
When is it a bug?
Bug classifications are used as a way to confirm where and why a certain behavior is a bug.
We use project documents to confirm the expected behavior/result of an application feature.
In most cases the Project Specification will be used as the guiding document.
Test Plans – Classifying the “Bugs”
Bug Classifications:
Software does not do something in the specification.
Software does something that the specification says it should not do.
Software does something that the specification does not mention.
Software does not do something it should **, that is not mentioned in the specification.
** missing a feature that is present in similar software
Test Plans – Classifying the “Bugs”
Some bugs do not fit into the standard categories.
Any unspecified / incorrect behavior should be reported.
Simple – Inconsistent formatting / spelling
Major – Crash (Exceptions, Blue screen of death, Data loss)
These are all aspects we expect to work correctly in any application.
Generally the programmer has failed to consider all cases when these bugs occur.
/docProps/thumbnail.jpeg