编程代写 BISM 7255 􏰀 SEMESTER 1-2021 A Digital Solution for Dance Studio 358

UML ASSIGNMENT 􏰀 BISM 7255 􏰀 SEMESTER 1-2021 A Digital Solution for Dance Studio 358
ASSESSMENT WEIGHTING: DUE DATE:
INTRODUCTION
Summary Task:

Copyright By PowCoder代写 加微信 powcoder

27 April 2022 at 2:00pm 31 March 2022
The assignment asks you to create a collection of UML diagrams (eight diagrams) that visually represent a business application for the dance studio 358.
Introduction of Case Scenario:
The Dance Studio 358 is a studio in Corinda that provides adults of any age a place to experience dance in a positive environment. In a term, different dance workshops are offered every week covering a range of different styles, Jazz, Ballet, Contemporary, and Tap. A workshop is a two-and-half-day or three-day course focused on a particular dance style.
Over time, more and more adults want to attend dance workshops. The 􏰁􏰂􏰃􏰄􏰅􏰆􏰇􏰁 􏰄􏰅􏰉􏰊􏰋􏰂􏰆􏰉, , manages all matters related to the studio with the Excel spreadsheet and pen and pencil. Doing it this way is very time-consuming, bears the potential for mistakes and errors, and limits the possibility for others to get involved.
Hence, Louise would like to have a digital solution to help him with the management of the dance studio. After consulting with Queensland Associated Dance Studios Inc. that represents all Queensland-based dance studios, Louise decided to hire the IT consulting company Blue Bridge to create the digital solution. , the owner of Blue Bridge, is tasked with the design of the system, and you are working with Michael to achieve this.
Assignment requirements for students:
1) You must use the software Enterprise Architect from the company Sparx Systems to create the UML diagrams.
2) You must in total create eight UML diagrams 􏰀 five diagrams that follow the case description and three diagrams that present a feature, or innovation that is not described in the Dance Studio 358 case description (􏰌􏰊 􏰉􏰊􏰍􏰊􏰉 􏰂􏰆 􏰂􏰎􏰊􏰏 􏰐􏰁 􏰑􏰅􏰒􏰒􏰆􏰓􏰐􏰂􏰅􏰆􏰒 􏰄􏰅􏰐􏰔􏰉􏰐􏰏􏰁􏰕. For 􏰏􏰆􏰉􏰊 􏰄􏰊􏰂􏰐􏰅􏰖􏰁􏰗 􏰁􏰊􏰊 􏰁􏰊􏰋􏰂􏰅􏰆􏰒 􏰘Task Description􏰇􏰙
3) Assignments with watermarks are not allowed because when there is a watermark in the diagram the marker cannot read your solutions 􏰀for further details inquire in the consultation with M. Wang.
4) You must use UML 2.5 􏰀This means the assignment must comply with the tutorial materials and by extension the OMG UML specification 􏰓􏰊􏰉􏰁􏰅􏰆􏰒 􏰚􏰙􏰛 􏰆􏰉 􏰜􏰝􏰐􏰉􏰞 􏰜􏰟􏰁􏰂􏰊􏰏􏰁􏰇 UML recommendations.
5) Your final submission is a Word document where the UML diagrams are copied in
6) You must also submit a SINGLE Enterprise Architect file that includes the eight UML 2.5 diagrams which the marker uses if the copied UML diagrams are not readable, or the marker wants to verify something. Do not submit diagrams another student created because
this is 􏰋􏰆􏰒􏰁􏰅􏰄􏰊􏰉􏰊􏰄 􏰘student misconduct􏰇 and will be dealt with according to UQ policies.

程序代写 CS代考 加微信: powcoder QQ: 1823890830 Email: powcoder@163.com