Investigation, Diagnosis and Rehabilitation Final Project
JHU CE 565.410 Due by Thursday, 5 December 2018
Copyright By PowCoder代写 加微信 powcoder
** Turn in via blackboard
Throughout the course, you have learned the principles and methodology behind the investigation,
diagnosis and rehabilitation of heritage structures. With this final project, you will is to combine the lessons
learned in each lecture and apply these tools to your own investigation project as outlined below:
St. Elizabeth’s west campus is composed of numerous historic buildings that need repair and rehabilitation.
We (the client) purchased the Center Building and are now in the process of developing a master plan that
includes rehabilitation options for a portion of the building, the Center Building (Buildings 1 and 2). We
understand and are sympathetic to the character-defining properties of the building; but plan to use this
space for office and would like a more open floor plan. The existing structural system includes the
following:
Existing Gravity-Load-Resisting-System
1. Foundations/Walls
Granite footings beneath load-bearing brick masonry walls
Exterior load-bearing, brick walls vary in width from 3 wythes to 5 wythes at the foundation
Interior load-bearing walls are 4 wythes, interior partitions are 2 wythes
Retaining lateral earth pressure on north perimeter of the building
2. Floor Systems
First Floor Framing: solid-sawn wood joists, load bearing masonry walls
Typical Floor (Floors 2 through 4): solid-sawn wood joists, load bearing masonry walls
Floor 3 at Gymnasium: original solid-sawn wood joists
3. Roof Systems
Roof over wings (A/B and D/E): solid-sawn wood rafters
Roof over center (C): wood and steel trusses and solid-sawn wood purlins
Existing Lateral-Load Resisting System
1. Vertical Elements: unreinforced brick masonry shear walls
2. Horizontal Diaphragms
Floor diaphragms: typical floors: wood decking (existing sheathing or new plywood), gymnasium: existing
concrete slab on metal deck
Roof diaphragms: typical roofs: wood decking (existing sheathing or new plywood)
Diaphragm connectors: wood decking nailed to wood framing
Some chord/collector elements are missing.
Due by Friday, 2 December 2022
** Turn in on paper/email/dropbox as needed
JHU 560.633.01/565.633.01VL
Final Project
Page 2 of 2
The two schemes we would like you to pursue are as follows:
Scheme 1 – Preservation
Evaluate existing structural system with limited modifications
Repair and reinforce as necessary to satisfy design criteria.
Scheme 2 – Façade Retention with for Open Plan
New concrete structural system within existing envelope (you pick floor system and if you will be
providing new vertical structural system or supporting it on existing brick masonry walls).
We would like you to prepare a report, concept repair drawings and an outline specification that includes
addresses the following components:
1. Provide a background summary on the history of the building that includes a summary of the structure,
its heritage and the character defining properties.
2. Prepare a structural design basis that includes the following information:
General Description of Project
Scope of Work, including rehabilitation concepts
Description of Structural Systems (Existing and New), including a description of gravity/lateral load
Referenced Building Codes and Standards
Load Criteria (Dead, Live, Wind, and Seismic)
Design Properties of Materials
3. Show calculations for the dead, wind, and seismic loads. Remember to check components and cladding
4. Review relevant building codes (IEBC 2012 and IBC 2012) as required to confirm the design
implications.
5. Provide a summary of the architectural features including the windows and roof systems to confirm how
you will reuse or replace these systems (in kind or with new materials).
6. Prepare a foundation, typical floor and roof framing plans andand a typical elevation. Include typical
details as needed to show the design intent. Develope an outline specification to show the materials and
general scope of work.
7. Summarize your recommendations for the structural strengthening and new concrete systems
considering costs. Use R.S. MEANS or contractor contacts to gather supporting cost information
toprepare a rough order–of-magnitude cost estimate for each option.